User Guide
Why can I only view 3 results?
You can also view all results when you are connected from the network of member institutions only. For non-member institutions, we are opening a 1-month free trial version if institution officials apply.
So many results that aren't mine?
References in many bibliographies are sometimes referred to as "Surname, I", so the citations of academics whose Surname and initials are the same may occasionally interfere. This problem is often the case with citation indexes all over the world.
How can I see only citations to my article?
After searching the name of your article, you can see the references to the article you selected as soon as you click on the details section.
 Views 8
 Downloands 3
Software Project Schedulinganalysis
2022
Journal:  
International Journal of Advanced Research
Author:  
Abstract:

Along with the number of projects received and must be completed on time by PT. EKIOSKU, where project scheduling has been carried out using the estimation method, so that it has an impact on the results of estimating time, human resources, and estimated costs of software projects that are quite large. In addition, for the tasksperformed by the project manager, its still carried out in an inefficient verbal way because each workforce has different abilities. Based on the existing problem conditions, itis necessary to recalculate for project scheduling by using the Function Point and COCOMO methods, it is hoped that it cangive an idealabor needs, processingtime, and project costs required.

Keywords:

0
2022
Author:  
Citation Owners
Information: There is no ciation to this publication.
Similar Articles








International Journal of Advanced Research

Field :   Sosyal, Beşeri ve İdari Bilimler

Journal Type :   Uluslararası

Metrics
Article : 10.413
Cite : 722
© 2015-2024 Sobiad Citation Index