User Guide
Why can I only view 3 results?
You can also view all results when you are connected from the network of member institutions only. For non-member institutions, we are opening a 1-month free trial version if institution officials apply.
So many results that aren't mine?
References in many bibliographies are sometimes referred to as "Surname, I", so the citations of academics whose Surname and initials are the same may occasionally interfere. This problem is often the case with citation indexes all over the world.
How can I see only citations to my article?
After searching the name of your article, you can see the references to the article you selected as soon as you click on the details section.
 Views 83
 Downloands 34
 Audio Listening 1
Karışık Modelli Montaj Hattı Dengeleme Problemi ve Bir İşletmede Uygulaması
2019
Journal:  
Journal of Academic Value Studies (JAVStudies)
Author:  
Abstract:

Günümüzde artan rekabet ile birlikte işletmelerin kaynaklarını etkin ve verimli kullanması zorunlu hale gelmiştir. Üretim hızı artarken aynı zamanda da üretim maliyetlerinin en aza indirilmesi için işletmelerin üretimlerinde birtakım iyileştirmeler yapmaları gerekliliği ortaya çıkmıştır. Montaj hattı dengeleme, verimliliği arttırmak amacı doğrultusunda üretim hatlarında yapılan çalışmaların önemli bir kısmını oluşturmaktadır. Montaj hatlarındaki kayıpların belirlenmesi ve en aza indirilmesi, işletmelere ciddi oranda maliyet kazancı getirmektedir. Bu çalışmada karışık modelli montaj hattı dengeleme konusu ele alınmış olup çalışmanın temel amacı, hat dengeleme ve benzetim tekniklerini kullanarak, çalışmanın yapıldığı montaj hattının performansını arttırmaktır. Çalışmada işletmede üretilen dört farklı ankastre modeli ele alınmış her biri için hattın çift taraflı ve düz (tek taraflı) yerleşim durumları için hat dengelemeleri yapılmıştır. Hat dengeleme yapılırken sezgisel bir yöntem olan “Konum Ağırlıklı Hat Dengeleme Tekniği” ve POM for Windows programından yararlanılmıştır. Bununla birlikte, hat dengeleme çalışması sonrası bulunan sonuçları sınamak için bir benzetim programı olan ARENA kullanılmış, mevcut ve önerilen sistem simüle edilmiş, sonuçlar değerlendirilmiştir. Montaj hattının çift taraflı istasyon yerleşimine göre dengelendiği durumda, istasyon sayısının azaldığı ve ortalama hat verimliliğinin daha fazla olduğu görülmüş, bu sebeple işletme açısından daha faydalı olacağı sonucuna ulaşılmıştır. Önerilen durumun benzetim modeli çalıştırıldığında, hattaki atıl sürelerin azaldığı ve buna paralel olarak günlük üretim miktarının arttığı görülmüştür. Elde edilen sonuçlar, hat dengeleme çalışmalarının benzetim tekniği ile desteklenmesinin iyi bir yaklaşım olabileceğini ortaya koymaktadır.

Keywords:

Mixed Model Assembly Line Balance Problem and Application In A Business
2019
Author:  
Abstract:

Today, with increasing competition, it has become compulsory for to use their resources effectively and efficiently. As the production rate increases, it also arises the need for to make a number of improvements in production to minimize production costs. The assembly line balance constitutes a significant part of the work on production lines in order to increase efficiency. Identification and minimization of losses on the assembly lines brings a serious cost gain. This study discussed the issue of mixed model assembly line balance and the main objective of the work is to improve the performance of the assembly line in which the work is done, using line balance and comparison techniques. In the study, four different anchor models produced in the enterprise were addressed for each of the line’s two-sided and flat (one-sided) settlement conditions. The line balance is used by the "Local Weight Line Balance Technique" and the POM for Windows program, which is an intuitive method of making line balance. However, ARENA, a comparison program to test the results found after the line balance study, used, existing and recommended system simulated, the results were evaluated. If the assembly line is balanced according to the double-sided station settlement, the number of stations has been reduced and the average line efficiency has been higher, therefore it will be more beneficial in terms of operation. When the model of comparison of the proposed situation was run, it was observed that the drop times on the line were reduced and the amount of daily production was increased parallelly. The achieved results show that supporting line balance studies by comparison technique can be a good approach.

Keywords:

Citation Owners
Information: There is no ciation to this publication.
Similar Articles








Journal of Academic Value Studies (JAVStudies)

Field :   Filoloji; Sosyal, Beşeri ve İdari Bilimler

Journal Type :   Uluslararası

Metrics
Article : 631
Cite : 1.704
© 2015-2024 Sobiad Citation Index