User Guide
Why can I only view 3 results?
You can also view all results when you are connected from the network of member institutions only. For non-member institutions, we are opening a 1-month free trial version if institution officials apply.
So many results that aren't mine?
References in many bibliographies are sometimes referred to as "Surname, I", so the citations of academics whose Surname and initials are the same may occasionally interfere. This problem is often the case with citation indexes all over the world.
How can I see only citations to my article?
After searching the name of your article, you can see the references to the article you selected as soon as you click on the details section.
  Citation Number 1
 Views 167
 Downloands 62
Bi̇r Deger Akisi Hari̇talama Uygulamasi: Bi̇r Teksti̇l Endustri̇si̇ Ornegi̇
2018
Journal:  
Trends in Business and Economics
Author:  
Abstract:

Lean manufacturing is a production strategy that has been used since 1950's. The main concern of this strategy is to determine resource of waste and try to eliminate waste. Companies do not only eliminate waste but also they try to keep their competitiveness as high as their competitors. Lean manufacturing has some tools such as Value Stream Mapping, Kanban, Kaizen, 5s, CONWIP etc. to imply over the production system to enhance its effectiveness. The goal of this paper is to apply Value Stream Mapping to improve production line of a textile company as a case study.  Value stream mapping (VSM) is one of the most used lean manufacturing technique for illustrating and analyzing the logic of a production process and it provides companies to see all production line on the paper. The main idea of VSM is to see the whole system as a picture not only part by part. In this paper, VSM was used to demonstrate the present production line and imply lean techniques on this map. Our selected company is a textile producer which exports their products from Istanbul to Europe. We apply 5s principles to reduce lead time and increase productivity. VSM final result shows that Production Lead Time (PLT) decreased 14.5 days to 5.2 days by applying lean techniques.

Keywords:

Citation Owners
Attention!
To view citations of publications, you must access Sobiad from a Member University Network. You can contact the Library and Documentation Department for our institution to become a member of Sobiad.
Off-Campus Access
If you are affiliated with a Sobiad Subscriber organization, you can use Login Panel for external access. You can easily sign up and log in with your corporate e-mail address.
Similar Articles










Trends in Business and Economics

Field :   Sosyal, Beşeri ve İdari Bilimler

Journal Type :   Uluslararası

Metrics
Article : 169
Cite : 86
© 2015-2024 Sobiad Citation Index