User Guide
Why can I only view 3 results?
You can also view all results when you are connected from the network of member institutions only. For non-member institutions, we are opening a 1-month free trial version if institution officials apply.
So many results that aren't mine?
References in many bibliographies are sometimes referred to as "Surname, I", so the citations of academics whose Surname and initials are the same may occasionally interfere. This problem is often the case with citation indexes all over the world.
How can I see only citations to my article?
After searching the name of your article, you can see the references to the article you selected as soon as you click on the details section.
 Views 18
 Downloands 6
Integration of wind power for optimal power system black-start restoration
2015
Journal:  
Turkish Journal of Electrical Engineering and Computer Science
Author:  
Abstract:

Integration of wind farms into power systems may increase the risk of power system blackouts due to the uncertain nature of their output power. In the meantime, wind turbines have relatively short starting time when compared to non-black-start (NBS) generating units. For this reason, wind farms need to participate in power system restoration after blackouts. The decision of restoring a wind farm depends on its output power and the characteristics of the power system. The power system restoration should be accomplished as soon as possible. For complete power system restoration, three stages must be completed: generation restoration, transmission system restoration, and load pick up. To achieve a faster restoration process, an optimal schedule for the black-start units to crank the NBS units is required with optimal transmission path selection. During the restoration process, to maintain the stability of the system and satisfy the system's operational constraints, an optimal load pick up sequence is required. In this paper, the firefly optimization algorithm is used to find the optimal final sequence of NBS unit restoration, the optimal transmission paths, and the optimal load pick up sequence with and without integration of wind farms in the system. The objective is to minimize the overall restoration time and the unserved load, which maximizes the energy capability and improves the sustainability of the system. The proposed algorithm is applied successfully to the IEEE 39-bus system.

Keywords:

Citation Owners
Information: There is no ciation to this publication.
Similar Articles












Turkish Journal of Electrical Engineering and Computer Science

Field :   Mühendislik

Journal Type :   Uluslararası

Metrics
Article : 2.879
Cite : 1.406
2023 Impact : 0.016
Turkish Journal of Electrical Engineering and Computer Science