User Guide
So many results that aren't mine?
References in many bibliographies are sometimes referred to as "Surname, I", so the citations of academics whose Surname and initials are the same may occasionally interfere. This problem is often the case with citation indexes all over the world.
How can I see only citations to my article?
After searching the name of your article, you can see the references to the article you selected as soon as you click on the details section.
 Views 3
 Downloands 1
Küçük Hidrolik Santrallerde Kapasite Faktör Analizi Ve Giresun Özelinde Bir Uygulama
2019
Journal:  
Gümüşhane Üniversitesi Fen Bilimleri Dergisi
Author:  
Abstract:

Enerji, minimum ölçekte canlı bedeninden büyük ölçekte sanayi tesislerine kadar hayatın her alanında sosyal ve ekonomik sürdürülebilirliğin temel yapı taşıdır. Sanayileşmedeki gelişim sürecini hızla arttıran Türkiye’de, enerji ihtiyacı büyük ölçüde ithal fosil kaynaklardan sağlanmaktadır. Ancak özellikle son yıllarda artan çevre bilinci, ekonomik ve stratejik gerekçelerle, enerji açığının bir kısmının yerli, temiz ve güvenilir kaynak olan hidroelektrik santrallerden karşılamasına büyük önem verilmiştir. Ülkemizde 2017 yılında toplam olarak 295511 GWh elektrik üretilmiş olup, bunun 41368 GWh’lık miktarını (%14) büyük hidrolik santraller ve 17082 GWh’lık miktarını da (%5,78) küçük hidrolik santraller karşılamıştır. Bu çalışmada, Türkiye'de, artan enerji maliyetlerinin düşürülmesine yönelik çalışmalara küçük hidroelektrik santrallerin (KHS) katkısı irdelenmiş ve Giresun özelinde kapasite faktör analizi yapılmıştır. Bu sonuçlara göre Rezervuar alanı bulunmayan ve benzer özelliklerdeki hidroelektrik santrallerde, kapasite faktörü arttıkça santral yatırımının geri dönüş süresinin kısaldığı sonucuna ulaşılmıştır.

Keywords:

Capacity Factor Analysis In Small Scale Hydropower Plants and A Practice Specific To Giresun
2019
Author:  
Abstract:

Energy is the fundamental element of social and economic sustainability in every aspect of life, from the smallest living body to large scale industrial facilities. In Turkey rapidly increasing industrial development process lead to extensive energy demand, which is met largely from imported fossil sources. Especially in recent years, as a result of increasing environmental awareness and economic and strategic reasons, a portion of the energy deficit is fed from, clean and reliable hydroelectric power plants with great importance. In our country, a total of 295511 GWh electricity was produced in 2017. About 41368 GWh (14%) of the total amount was generated by large hydraulic plants and 17082 GWh (5.78%) by small hydraulic plants. In this study, small hydroelectric power (SHP) stations are considered  to reduce the increasing energy cost and for this purpose SHP in Giresun are analyzed leading to private additives in the capacity factor analysis. According to the results it is possible to conclude that thetime of power plant investment is shortened as the capacity factor increases in hydroelectric power plants.

Keywords:

Citation Owners
Information: There is no ciation to this publication.
Similar Articles








Gümüşhane Üniversitesi Fen Bilimleri Dergisi

Field :   Fen Bilimleri ve Matematik; Mimarlık, Planlama ve Tasarım; Mühendislik; Ziraat, Orman ve Su Ürünleri

Journal Type :   Uluslararası

Metrics
Article : 674
Cite : 1.280
2023 Impact : 0.167
Gümüşhane Üniversitesi Fen Bilimleri Dergisi