The wastes occurring during construction and demolition are among the heaviest and bulky solid wastes. In this study, the awareness of construction-related stakeholders about the construction and demolition waste (CDW) issue is determined. A survey is conducted among municipalities that are in the decision-making position in the construction sector, the contractors of private sector, and building inspection agencies. As a result of the study, the activities and awareness of the economically advanced municipalities in this regard were found to be considerable. The contractors are not insensitive to the subject and pay attention to the warnings they receive from municipalities and building inspectors. The stakeholders agree on that the solid waste management begins by the time project starts and recyclable materials should be used. The stakeholders also have the same opinion about that the demolition waste and excavated soil should be dumped into the regulated deposit areas.
Benzer Makaleler | Yazar | # |
---|
Makale | Yazar | # |
---|