User Guide
Why can I only view 3 results?
You can also view all results when you are connected from the network of member institutions only. For non-member institutions, we are opening a 1-month free trial version if institution officials apply.
So many results that aren't mine?
References in many bibliographies are sometimes referred to as "Surname, I", so the citations of academics whose Surname and initials are the same may occasionally interfere. This problem is often the case with citation indexes all over the world.
How can I see only citations to my article?
After searching the name of your article, you can see the references to the article you selected as soon as you click on the details section.
 Views 10
 Downloands 2
Expanding the functionality of learning management systems and analysis of the implementation results
2020
Journal:  
Technology Audit and Production Reserves
Author:  
Abstract:

An important function of the introduction of electronic learning systems and learning management is time management, or schedule. This function is undeservedly ignored by most systems of this class (LMS – Learning Management System), despite their relevance. This is especially true of systems of classical, full-time education in classes. So, the object of research is the learning management system, that is, the automation of the educational process management functions. One of the objectives of the learning planning process is scheduling. This work is dedicated to this very task. One of the options for solving this problem is considered in the work – the use of an adapted approach to scheduling work from the mass service sector to the problem of planning the work of an educational institution and scheduling classes to meet the needs of the educational process is proposed. Compared with other known methods, which are predominantly of «exhaustive» type, this method is less costly and shows good results in practical applications. That is, compiled schedules are suitable and require little additional human costs. The positive results of the implementation of the developed software product are obtained and demonstrated using specific examples: improving the quality of work of the management team, methodologists and teachers. The resulting schedules turn out to be qualitative – appropriate or exceed expectations. This is due to the similarity of planning approaches used to solve problems in both areas – managing call center personnel and scheduling for a school or university. Improved management of the training schedule – in particular, indicators of the process of making changes to the lesson schedule. The novelty and main value of the work lies in the transfer and adaptation of known methods to solve new problems. Thus, it is possible to solve the well-known problem with a new method adapted and adapted to new needs. Moreover, this method is quite effective in terms of time costs. Author Biography Zainab Al-Hilali, Taras Shevchenko National University of Kyiv, 60, Volodymyrska str., Kyiv, Ukraine, 01033 Postgraduate Student Department of Information Systems

Keywords:

Citation Owners
Information: There is no ciation to this publication.
Similar Articles












Technology Audit and Production Reserves

Field :   Fen Bilimleri ve Matematik

Journal Type :   Uluslararası

Metrics
Article : 2.454
Cite : 270
2023 Impact : 0.047
Technology Audit and Production Reserves