User Guide
Why can I only view 3 results?
You can also view all results when you are connected from the network of member institutions only. For non-member institutions, we are opening a 1-month free trial version if institution officials apply.
So many results that aren't mine?
References in many bibliographies are sometimes referred to as "Surname, I", so the citations of academics whose Surname and initials are the same may occasionally interfere. This problem is often the case with citation indexes all over the world.
How can I see only citations to my article?
After searching the name of your article, you can see the references to the article you selected as soon as you click on the details section.
 Views 2
Ulaştırma Projeleri Fizibilite Etütlerinde Bulanık Çok Kriterli Bir Değerlendirme Modeli
2022
Journal:  
Politeknik Dergisi
Author:  
Abstract:

Ulaştırma yatırımları değerlendirme aşamasında teknik, ekonomik, mali, olmak üzere birçok yönden incelenmektedir. Bu amaçla hazırlanan fizibilite etütleri yatırımın amaçlarını belirlemeyi, projelerin tüm aşamalarında görülebilecek problemleri tespit etmeyi ve yatırımın gerçekleşmesi durumunda sağlanacak faydaları görmeyi sağlamaktadır. Fizibilite etütlerinin değerlendirilmesi her şeyden önce bilimsel esaslara dayalı olmalıdır. Bu çalışmada fizibilite etütlerini değerlendirmek için üç aşamalı bir model geliştirilmiştir. Aşama 1’de kriterler ve alternatifler belirlenmiştir. Aşama 2’de kriterlerin önem seviyelerinin belirlenmesinde Best-Worst Method (BWM) kullanılmıştır. Aşama 3’te fizibilite etütlerinin değerlendirilmesi için bulanık tabanlı Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) ile oluşturulan bir model önerilmiştir. Önerilen yöntemin etkinliğini göstermek için güncel projeler alternatif olarak belirlenmiştir. Beş proje alternatif olarak belirlendikten sonra Alternatif 2 en iyi alternatif olarak bulunmuştur. Yapılan çalışma ile ekonomi, teknoloji ve ulaştırmanın fizibilite etütlerinin değerlendirilmesinde daha etkili kriterler olduğu sonucuna ulaşılmıştır.

Keywords:

A Fuzzy Multi-criteria Assessment Model For Feasibility Studies Of Transportation Projects
2022
Journal:  
Politeknik Dergisi
Author:  
Abstract:

Transportation investments are examined from many aspects, including technical, economic and financial, during the evaluation phase. Feasibility studies prepared for this purpose; It enables to identify the objectives of the investment, to see the problems that can be seen at all stages of the projects and the benefits to be gained in case the investment is realized. Evaluation of feasibility studies should be based on scientific principles above all. In this study, a three-stage model has been developed to evaluate feasibility studies. Criteria and alternatives were determined in stage 1. In stage 2, Best-Worst Method (BWM) for determining the level of significance of the criteria were used. In stage 3, a multi-criteria model created with fuzzy-based Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) is proposed for the feasibility studies assessment. Current projects have been identified as alternatives to indicate the efficiency of the recommended process. After five projects were determined as alternatives, Alternative 2 was found as the best alternative. With the study, it was concluded that economy, technology and transportation are more effective criteria in the evaluation of feasibility studies.

Keywords:

Citation Owners
Information: There is no ciation to this publication.