User Guide
Why can I only view 3 results?
You can also view all results when you are connected from the network of member institutions only. For non-member institutions, we are opening a 1-month free trial version if institution officials apply.
So many results that aren't mine?
References in many bibliographies are sometimes referred to as "Surname, I", so the citations of academics whose Surname and initials are the same may occasionally interfere. This problem is often the case with citation indexes all over the world.
How can I see only citations to my article?
After searching the name of your article, you can see the references to the article you selected as soon as you click on the details section.
 Views 20
 Downloands 1
TECHNO-ECONOMIC ANALYSIS OF 1 MWE SOLAR POWER PLANT USING COMBINED RANKINE CYCLE IN IZMIR, TURKEY
2018
Journal:  
International Journal of Energy and Smart Grid
Author:  
Abstract:

In the last decades, there is an increasing attention on renewable energy sources to overcome energy related problems such as global warming/climate change, security of energy supply, depletion of fossil fuels, unpredictable energy prices, conflictions on energy sources etc. Solar energy is an abundant source of renewable energy readily available on the earth. With the recent developments in solar energy conversion technologies, concentrating solar power (CSP) systems for heat and power productions have become attractive solutions. Currently, CSP systems using parabolic trough collectors (PTCs) are dominated the global CSP market since there are the most mature technology and the most installed CSP systems in the world. Turkey is one of the countries benefiting from good solar radiation, so CSP systems may be one of the solutions for the renewable energy production. In this study, technoeconomic analysis of a small (1 MWe) PTC-CSP power plant using combined Rankine cycle for electricity production in Izmir, Turkey, is presented as a case study for an example of PTC-CSP power plant utilization in the locations in Turkey with high solar radiation values. Levelized cost of electricity (LCOE), internal rate return, net present value and payback period of the power plant for three different layout configurations of the PTCs in the solar field are calculated by using System Advisory Model (SAM), MATLAB and Excel softwares. The results show that for 1MWe PTC-CSP power plant in İzmir, the initial investment cost is approximately 3.9 Million USD with LCOE of 135 USD/MWh, and the annual operational cost of 37.5 USD/MWh with a payback period of 11.5 years. Also, the required cost for site optimization (RCO) per kWth of exergy destruction and energy loss for the solar field configuration #1 is found to be 1830.2 USD and 1887.5 USD respectively. These results figure out that there are some possible improvements to be achieved. However, the values for the solar field configuration #2 and #3 are closed to the minimal RCO per kWth. This means that no further improvement can be achieved. 

Keywords:

Citation Owners
Information: There is no ciation to this publication.
Similar Articles












International Journal of Energy and Smart Grid

Field :   Fen Bilimleri ve Matematik

Journal Type :   Uluslararası

Metrics
Article : 36
Cite : 17
International Journal of Energy and Smart Grid