User Guide
Why can I only view 3 results?
You can also view all results when you are connected from the network of member institutions only. For non-member institutions, we are opening a 1-month free trial version if institution officials apply.
So many results that aren't mine?
References in many bibliographies are sometimes referred to as "Surname, I", so the citations of academics whose Surname and initials are the same may occasionally interfere. This problem is often the case with citation indexes all over the world.
How can I see only citations to my article?
After searching the name of your article, you can see the references to the article you selected as soon as you click on the details section.
 Views 10
Transport construction cost management by rational organizational and technological solutions
2020
Journal:  
Eastern-European Journal of Enterprise Technologies
Author:  
Abstract:

Special conditions of implementation of construction projects of transport facilities show that cost management requires appropriate optimization of organizational and technological solutions. The computer model and method for selecting optimal management by the criterion of construction cost minimization are developed. The model shows the organizational and technological variability of the enterprise, characteristic of transport construction. The method allows to carry out variant modeling, according to which the patterns of changes in the construction cost, the ratio of direct and general production costs are compiled under the influence of the following factors: average complexity of the project totality, average relocation distance, attribution of resources, industrialization of applied solutions. The numerical experimental studies quantitatively proved that organizational and technological solutions characteristic of the enterprise as a whole affect the solutions of individual construction projects of transport facilities. In particular, it was found that with a decrease in the average complexity of the project totality, the influence of industrialization of applied solutions is reversed and begins to increase the cost of works. The lowest value of cost change (–13.6 %) was found, characterized by the most effective organizational and technological solutions: the average complexity of the project totality X1=2.2 thousand hours, the average relocation distance Х2=100 km, using only own equipment and labor resources (Х3=0 %), minimal industrialization of applied solutions (Х4=0 %). It was revealed that contracting organizations building relatively small transport facilities should use traditional methods of work. The cost efficiency of solutions, according to which enterprises constructing geographically dispersed facilities should use contracted resources with local material and technical base was also determined. Author Biographies Oleksandr Meneylyuk, Odessa State Academy of Civil Engineering and Architecture Didrikhsona str., Odessa, Ukraine, 65029 Doctor of Technical Sciences, Professor Department of Technology of Building Industry

Keywords:

Citation Owners
Information: There is no ciation to this publication.
Similar Articles










Eastern-European Journal of Enterprise Technologies

Field :   Fen Bilimleri ve Matematik

Journal Type :   Uluslararası

Metrics
Article : 4.764
Cite : 4.484
2023 Impact : 0.294
Eastern-European Journal of Enterprise Technologies