User Guide
Why can I only view 3 results?
You can also view all results when you are connected from the network of member institutions only. For non-member institutions, we are opening a 1-month free trial version if institution officials apply.
So many results that aren't mine?
References in many bibliographies are sometimes referred to as "Surname, I", so the citations of academics whose Surname and initials are the same may occasionally interfere. This problem is often the case with citation indexes all over the world.
How can I see only citations to my article?
After searching the name of your article, you can see the references to the article you selected as soon as you click on the details section.
  Citation Number 4
 Views 8
 Downloands 2
İKİ MAKİNE AKIŞ TİPİ ÖĞRENME ETKİLİ ÇİZELGELEMEDE ORTAK TESLİM TARİHİNDEN MUTLAK SAPMALARIN EN KÜÇÜKLENMESİ
2009
Journal:  
Gazi Üniversitesi Mühendislik Mimarlık Fakültesi Dergisi
Author:  
Abstract:

Yöneylem araştırmasıyla ilgili pek çok alanda öğrenme etkisinin dikkate alındığı çalışmalar mevcuttur. Buna karşın üretim çizelgelemede bu konuyla ilgili çalışma sayısı az, akış tipinde ise daha azdır. Erken/Geç (E/G) tamamlanma problemi 1990 yılların başına kadar ağırlıklandırılmış mutlak sapma problemi olarak bilinmekteydi. Hem erken hem de geç tamamlanma zamanı çizelgeleme problemlerinde önemli ölçütlerdir. Toplam gecikme ölçütü teslim tarihlerine uyuma ilişkin göstergeleri sağlarken (erken tamamlanan işlere ilişkin sonuçları göz ardı ederek), sadece geç tamamlanan işlerin cezaları ile ilgilenir. Ancak bu eğilim tam zamanında üretim (TZÜ) konusuna olan artan ilgi ile birlikte değişmeye başlamıştır. TZÜ’de erken tamamlanma geç tamamlanma kadar önemlidir. Bu çalışmada iki makine akış tipi ortamlı çizelgelemede ağırlıklı erken/geç tamamlanma performans kriteri ve öğrenme etkili işleme özelliği dikkate alınarak bir tamsayılı programlama modeli önerilmiş ve örnek problemlerle çözüm sonuçları değerlendirilmiştir.

Keywords:

The two-machine-ship type learning the most effective reduction of the happy packages from the date of delivery to the line-up
2009
Author:  
Abstract:

There are studies that take into account the impact of learning in many areas related to the orientation research. However, the number of work on this subject in the production chart is less, and in the flow type is less. The problem of early / late completion (E / G) was known as the problem of absolute deviation which was emphasized until the early 1990s. Early and late completion times are important criteria in planning problems. While the total delay measure provides indicators of conformity to the delivery dates (ignorating the results of early completed work), it only concerns the penalties of late completed work. But this trend has begun to change with the increased interest in the topic of production (TZU) in time. Early completion in TZU is important until late completion. In this study, a comprehensive programming model was proposed, taking into account the criteria of performance of early / late completion and the learning efficient processing characteristics in the two machine-flow-type environmental charting and assessed the results of the solution with sample problems.

Keywords:

Citation Owners
Attention!
To view citations of publications, you must access Sobiad from a Member University Network. You can contact the Library and Documentation Department for our institution to become a member of Sobiad.
Off-Campus Access
If you are affiliated with a Sobiad Subscriber organization, you can use Login Panel for external access. You can easily sign up and log in with your corporate e-mail address.
Similar Articles








Gazi Üniversitesi Mühendislik Mimarlık Fakültesi Dergisi

Field :   Mimarlık, Planlama ve Tasarım; Mühendislik

Journal Type :   Uluslararası

Metrics
Article : 2.369
Cite : 6.309
2023 Impact : 0.094
Gazi Üniversitesi Mühendislik Mimarlık Fakültesi Dergisi