User Guide
Why can I only view 3 results?
You can also view all results when you are connected from the network of member institutions only. For non-member institutions, we are opening a 1-month free trial version if institution officials apply.
So many results that aren't mine?
References in many bibliographies are sometimes referred to as "Surname, I", so the citations of academics whose Surname and initials are the same may occasionally interfere. This problem is often the case with citation indexes all over the world.
How can I see only citations to my article?
After searching the name of your article, you can see the references to the article you selected as soon as you click on the details section.
  Citation Number 2
 Views 18
 Downloands 3
Sulama Şebekelerinde Bakım Performansının Değerlendirilmesi: Yozgat İli Örneği
2021
Journal:  
Atatürk Üniversitesi Ziraat Fakültesi Dergisi
Author:  
Abstract:

Bu çalışmada Yozgat İlinde bulunan 8 sulama birliğinin bakım performansları (Planlanan bakımın gerçekleşme oranı (%), Bakım masrafının sulanan alana oranı (€ ha-1), Bakım masrafının sulama alanına oranı (€ ha-1), Bakım masrafının toplam gelire oranı (%), Bakım masrafının toplam gidere oranı (%), Finansal yeterlilik (%)) değerlendirilmiştir. Planlanan bakımın gerçekleşme oranı en yüksek (%77.7) 2017 yılında Köseli, en düşük ise Sekili sulama birliğinde (%1.3) gerçekleşmiştir. Bakım masrafının sulanan alana oranı göstergesine göre en yüksek birim sulanan alana yapılan masraf, 2017 yılında Çaydoğan’da (58.2 € ha-1), en düşük ise 0.4 € ha-1 ile Sekili sulama birliğinde yapılmıştır. Sulama şebekelerinde bakım masrafının toplam gelire oranı en yüksek 2017 yılında %29.2 ile Köseli’de, en düşük ise %0.4 ile Sekili sulamasında elde edilmiştir. Finansal yeterlilik oranı %48 ile en düşük paşaköyde bulunurken %312 ile en yüksek sekilide bulunmuştur. Çalışma yapılan sulama şebekelerinde planlanan işletme bakım bütçelerinin planlanana uygun biçimde olmadığı görülmüştür. Bir sulama birliğinde, ihtiyaç duyulan temel bakım masraflarının yapılanması sulama performansını olumlu yönde etkilemektedir.

Keywords:

Assessment Of Maintenance Performance In Water User Associations: A Case Study Of Yozgat Province
2021
Author:  
Abstract:

In this study, 8 water user associations (WUAs) were chosen to assess maintenance performance with indicators (realized rate of planned maintenance (%), maintenance cost per unit command/irrigated area (€ ha-1), rate of maintenance cost to total income (%), rate of maintenance cost to total expenditure (%), financial adequacy (%)). As a result, realization rate of planned maintenance were found to be the highest as 77.7% in Köseli WUA in the year 2017 while the lowest was (1.3%) in Sekili WUA. Total maintenance cost per unit command area was found to be the highest (58.2 € ha-1) in Çaydoğan WUA, and the lowest (0.4 € ha-1) in Sekili WUA. Ratio of total maintenance cost to total income was determined as the highest (29.2%) in Köseli WUA in 2017 and the lowest (0.4%) in Sekili WUA. Financial adequacy ratios were changed between 48% to 312% among WUAs. It was observed that the maintenance budgets planned in WUAs were not compatible. According to results, it can be said that fulfilment of the basic maintenance costs needed affect the irrigation performance positively in a WUA.

Keywords:

Citation Owners
Attention!
To view citations of publications, you must access Sobiad from a Member University Network. You can contact the Library and Documentation Department for our institution to become a member of Sobiad.
Off-Campus Access
If you are affiliated with a Sobiad Subscriber organization, you can use Login Panel for external access. You can easily sign up and log in with your corporate e-mail address.
Similar Articles












Atatürk Üniversitesi Ziraat Fakültesi Dergisi

Field :   Ziraat, Orman ve Su Ürünleri

Journal Type :   Ulusal

Metrics
Article : 1.687
Cite : 5.197
2023 Impact : 0.232
Atatürk Üniversitesi Ziraat Fakültesi Dergisi