User Guide
Why can I only view 3 results?
You can also view all results when you are connected from the network of member institutions only. For non-member institutions, we are opening a 1-month free trial version if institution officials apply.
So many results that aren't mine?
References in many bibliographies are sometimes referred to as "Surname, I", so the citations of academics whose Surname and initials are the same may occasionally interfere. This problem is often the case with citation indexes all over the world.
How can I see only citations to my article?
After searching the name of your article, you can see the references to the article you selected as soon as you click on the details section.
  Citation Number 1
 Views 13
 Downloands 1
THE DEVELOPMENT OF THE RISK MANAGEMENT MECHANISM FOR INNOVATION PROJECT
2018
Journal:  
EUREKA: Physics and Engineering
Author:  
Abstract:

It is established that the high probability of emergence of risk situations in the innovation project, requires the implementation of risk management measures. It is noted that there is currently no mechanism for distributing of financial risks between the customer and the executor of the innovation project, that is largely negatively reflected in the desire to invest own funds in innovation. The methodological bases of risk management of innovative activity of the project-oriented organization are offered in the article. With the proposed approach, it is possible to estimate in advance how much the proposed risk management measures can reduce the risk of an innovation project and how this activity will affect on the project's effectiveness in deciding whether to continue or stop the innovation project research. On the basis of the existing characteristics of the risk measures of the innovation project, it can be concluded that the best indicator of the effectiveness of a certain stage of the innovation project by the results of simulation is net present value of the project. It is better to use the probability of receiving an ineffective result of an innovation project at an appropriate stage for assessing of the risk of the innovation project and the decision to continue or stop the innovation project at a certain stage.

Keywords:

Citation Owners
Attention!
To view citations of publications, you must access Sobiad from a Member University Network. You can contact the Library and Documentation Department for our institution to become a member of Sobiad.
Off-Campus Access
If you are affiliated with a Sobiad Subscriber organization, you can use Login Panel for external access. You can easily sign up and log in with your corporate e-mail address.
Similar Articles












EUREKA: Physics and Engineering

Field :   Mühendislik

Journal Type :   Uluslararası

Metrics
Article : 490
Cite : 293
2023 Impact : 0.242
Quarter
Basic Field of Engineering
Q1
12/114

EUREKA: Physics and Engineering