User Guide
Why can I only view 3 results?
You can also view all results when you are connected from the network of member institutions only. For non-member institutions, we are opening a 1-month free trial version if institution officials apply.
So many results that aren't mine?
References in many bibliographies are sometimes referred to as "Surname, I", so the citations of academics whose Surname and initials are the same may occasionally interfere. This problem is often the case with citation indexes all over the world.
How can I see only citations to my article?
After searching the name of your article, you can see the references to the article you selected as soon as you click on the details section.
 Views 14
Hydrodynamic Simulation of Flood Due to Hypothetical Momentary Mosul Dam Failure
2020
Journal:  
FAMagazine
Author:  
Abstract:

Flood wave simulation due to hypothetical momentary failure of Mosul Dam was carried out by applying the (IBER) hydrodynamic model for the dam storage scenarios (300, 310, 320, 330 and 335) meter above sea level after testing the validity and calibration the model to identify areas that will be inundated between dam site and south Mosul City. Flood waves simulation maps representing borders, water levels and depths were drawn. The inundated areas for between dam site and north Mosul city were determined for the mentioned storage scenarios are (69.14, 114.76, 158.2, 202.5 and 245.6) km2 respectively. The minimum and maximum percentage of the inundated area within Mosul City was also calculated to be (25.6-54.6) % respectively out of the total city area. The maximum flood wave discharges at the failed dam breach and at Mosul City due to the worst dam storage scenario (335) m a.s.l are (781132 and 337138) m3/s respectively. While the elapsed travel time for maximum discharge reaching Mosul City is (4.18) hours from the initiation of dam failure. The maximum flood depth within Mosul City is (36.7) m occurred after (4.68) hours. Finally, the routing percentage occurred in the maximum flooding discharge (attenuation) between dam site and Mosul City for storage scenario (335) meters is 56.8% while the lag time was (4.03) hours.

Keywords:

Citation Owners
Information: There is no ciation to this publication.
Similar Articles










FAMagazine

Journal Type :   Uluslararası

Metrics
Article : 702
Cite : 28
FAMagazine