User Guide
Why can I only view 3 results?
You can also view all results when you are connected from the network of member institutions only. For non-member institutions, we are opening a 1-month free trial version if institution officials apply.
So many results that aren't mine?
References in many bibliographies are sometimes referred to as "Surname, I", so the citations of academics whose Surname and initials are the same may occasionally interfere. This problem is often the case with citation indexes all over the world.
How can I see only citations to my article?
After searching the name of your article, you can see the references to the article you selected as soon as you click on the details section.
  Citation Number 7
 Views 6
 Downloands 3
ARAZİ TOPLULAŞTIRMASININ SULAMA PROJELERİNİN PERFORMASI ÜZERİNE ETKİLERİ
2013
Journal:  
Anadolu Tarım Bilimleri Dergisi
Author:  
Abstract:

Arazi toplulaştırma projelerinin, parsellere ulaşım sağlanması, su kaynaklarının etkin kullanılması, parsellerin birleştirilmesi, sulama ve drenaj projelerinin maliyetlerinin azaltılması başta olmak üzere birçok yararı bulunmaktadır. Bu çalışma kapsamında Bafra Ovası Sol Sahilinde yeralan toplulaştırma çalışmaları ele alınmıştır. Bu alandaki sulama ve drenaj inşaatı çalışmaları 1996 yılında toplulaştırmasız halde projendirilmiş ve ihale edilmiştir. Ancak çalışmalara başlanılmadan önce bu alan arazi toplulaştırma kapsamına alınmış, tüm sulama ve drenaj şebekesi yeniden revize edilmiş ve proje toplulaştırmaya uygun hale getirilmiştir. Araştırmada toplulaştırmasız ve toplulaştırmalı şartlardaki sulama şebekesinin sulama oranı, toplulaştırma oranı, sulama ve drenaj yoğunluğu, kamulaştırma maliyetleri gibi performans kriterleri incelenmiştir. Arazi toplulaştırmasız durumda sulama oranının %27, parsel sayısının 1315, sulama ve drenaj yoğunluğunun sırasıyla 23.79 m/ha ve 24.53 m/ha olacağı belirlenmiştir. Toplulaştırmalı bir şekilde sulama ve drenaj şebekesinin inşaatının yapılması ile sulama oranı %95.84, parsel sayısı 616 olmuş, toplulaştırma oranı ise %53 olarak gerçekleşmiştir. Sulama ve drenaj yoğunluğu sırasıyla 36.88 m/ha ve 39.98 m/ha olmuştur. Toplulaştırma yapılmadan sulama ve drenaj sisteminin inşaa edilmesi durumunda, sulama ve drenaj kanallarının inşaatı için yaklaşık 115 da lık alanın kamulaştırılmasına gereksinim duyulacağı belirlenmiştir. Sulama ve drenaj inşaatı çalışmaları mutlaka toplulaştırma projeleri ile birlikte yapılmalıdır. Çalışmalara başlanılmış olan sulama projelerinin ise yeniden revize edilerek, toplulaştırmalı hale getirilmesinin projelerden beklenilen faydanın sağlanmasına çok yarar sağlayacağı, belirlenmiştir.

Keywords:

The impact of the land collection on the performance of the SULAMA projects
2013
Author:  
Abstract:

Ground assembly projects have many benefits, including transportation to parcels, the efficient use of water resources, the combination of parcels, the reduction of the costs of water and drainage projects. In the framework of this study, the work of socialization located on the left coast of the Bafra Ovası was discussed. The construction work in this area of irrigation and drainage was projected and drawn out in 1996 without collectivity. However, before the work began, this area was taken into the scope of land collectivity, the entire irrigation and drainage network was re-revised and the project was made suitable for collectivity. The study examined performance criteria such as the irrigation rate, the irrigation rate, the irrigation and drainage intensity, and the privatization costs of the irrigation network in non-socialized and socialized conditions. In the case of land uncollectivity, the irrigation rate is estimated to be 27%, the number of parcels will be 1315, the irrigation and drainage intensity will be 23.79 m/ha and 24.53 m/ha respectively. With the construction of the hydration and drainage network, the hydration rate was 95.84, the number of parcels was 616 and the cumulation rate was 53%. The hydration and drainage intensity was respectively 36.88 m/ha and 39.98 m/ha. In the event of the construction of the irrigation and drainage system without the collectivization, the construction of the irrigation and drainage channels will require the privatization of approximately 115 square areas. Water and drainage construction work must necessarily be done together with socialization projects. The project will be re-revised and re-assemblyed to provide the expected benefit from the projects.

Keywords:

Citation Owners
Attention!
To view citations of publications, you must access Sobiad from a Member University Network. You can contact the Library and Documentation Department for our institution to become a member of Sobiad.
Off-Campus Access
If you are affiliated with a Sobiad Subscriber organization, you can use Login Panel for external access. You can easily sign up and log in with your corporate e-mail address.
Similar Articles






Anadolu Tarım Bilimleri Dergisi

Field :   Ziraat, Orman ve Su Ürünleri

Journal Type :   Ulusal

Metrics
Article : 824
Cite : 4.305
2023 Impact : 0.165
Anadolu Tarım Bilimleri Dergisi