User Guide
Why can I only view 3 results?
You can also view all results when you are connected from the network of member institutions only. For non-member institutions, we are opening a 1-month free trial version if institution officials apply.
So many results that aren't mine?
References in many bibliographies are sometimes referred to as "Surname, I", so the citations of academics whose Surname and initials are the same may occasionally interfere. This problem is often the case with citation indexes all over the world.
How can I see only citations to my article?
After searching the name of your article, you can see the references to the article you selected as soon as you click on the details section.
 Views 30
 Downloands 2
A New Crossover Operator for Single Machine Total Weighted Tardiness Problem with Sequence Dependent Setup Times
2012
Journal:  
Gazi University Journal of Science
Author:  
Abstract:

The single machine total weighted tardiness problem with sequence dependent setup times is a challenging and heavily studied problem. This problem is NP-hard, so several heuristics have been proposed in the literature so far. One of them is the genetic algorithm. The genetic algorithm is both powerful solution technique and applicable to wide range of different problem types, although its performance is heavily parameter and operator dependent. It is seen in literature that the well-conducted and adapted genetic algorithm operators and parameters increase the solution quality. In this study, a new crossover operator is proposed for the single machine with sequence dependent setup times problem to minimize the total weighted tardiness. The proposed crossover operator improves the relative positions by using apparent tardiness cost with setups (ATCS) heuristic while preserving the absolute positions. These are the two main aspects of the permutation type crossover operators for scheduling problems. The performance of the proposed crossover operator is tested by comparing it with partially mapped crossover (PMX) in different test cases using benchmark instances from literature. It is shown that the proposed ATCS based crossover operator gives better results than PMX in all test problems. Key Words: Weighted tardiness scheduling, Sequence dependent setups, Genetic algorithm, Crossover operator    

Keywords:

Citation Owners
Information: There is no ciation to this publication.
Similar Articles








Gazi University Journal of Science

Field :   Fen Bilimleri ve Matematik; Mühendislik

Journal Type :   Uluslararası

Metrics
Article : 1.843
Cite : 1.746
2023 Impact : 0.165
Gazi University Journal of Science