User Guide
Why can I only view 3 results?
You can also view all results when you are connected from the network of member institutions only. For non-member institutions, we are opening a 1-month free trial version if institution officials apply.
So many results that aren't mine?
References in many bibliographies are sometimes referred to as "Surname, I", so the citations of academics whose Surname and initials are the same may occasionally interfere. This problem is often the case with citation indexes all over the world.
How can I see only citations to my article?
After searching the name of your article, you can see the references to the article you selected as soon as you click on the details section.
 Views 7
 Downloands 1
İki amaçlı esnek atölye tipi çizelgeleme probleminin tasarımı ve analizi: İnşaat ekipmanları imalatı sektöründe bir vaka çalışması
2020
Journal:  
Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi
Author:  
Abstract:

Bu çalışmada esnek atölye tipi üretim çizelgeleme probleminin kapasite kısıtları altında programlanması için karmaşık tamsayı doğrusal optimizasyon modelinin tasarlanması ve geliştirilmesi kesin çözüm algoritması kullanılarak sağlanmıştır. Modelleme yaklaşımı, gerçek vakalar üzerinden veri analizini sağlamak, üretim hatlarındaki üretim süresini en aza indirmek, toplam üretim maliyetlerini azaltmak ve matematiksel programlama probleminin önemli özelliklerini detaylı olarak ortaya koymak için tasarlanmıştır. Bu çalışmanın temel amacı, iki amaçlı çizelgeleme problemleri için ϵ-kısıt yöntemini kullanarak daha hızlı ve verimli çözüm setleri elde etmektir. Gerçek hayat verileri kullanılarak elde edilen Pareto çözüm setleri karar vericiler ile paylaşılmıştır. İki amaçlı çizelgeleme problemi için geliştirilen karmaşık tamsayı doğrusal optimizasyon modelinin çözüm aşamasında GAMS programlama dili kullanılmıştır ve şirketin üretim maliyetlerinde %16.6’lık bir iyileştirme gerçekleştirilmiştir.

Keywords:

Design and Analysis Of Bi-objective Flexible Job Shop Scheduling Problem: A Case Study In Construction Equipment Manufacturing Industry
2020
Author:  
Abstract:

This paper presents a design and development of mixed-integer linear optimization model for scheduling of flexible job-shop production problem under capacity constraints by using exact solution algorithm. Modelling approach is designed in order to introduce data analysis in real situations, minimize production time in production lines, reduce total production costs, and reveal important features of mathematical programming problem in detail. The main purpose of this study is to obtain faster and efficient Pareto solution sets for bi-objective problem by using ϵ-constraint method. Generated Pareto frontier using real life data is shared with decision makers. The GAMS programming language is used during the solution phase of a mixed-integer linear optimization model for bi-objective problem and production efficiency of the company is increased around 16.6% in terms of production cost.

Keywords:

Citation Owners
Information: There is no ciation to this publication.
Similar Articles










Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi

Field :   Mühendislik

Journal Type :   Ulusal

Metrics
Article : 1.968
Cite : 4.367
2023 Impact : 0.145
Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi