User Guide
Why can I only view 3 results?
You can also view all results when you are connected from the network of member institutions only. For non-member institutions, we are opening a 1-month free trial version if institution officials apply.
So many results that aren't mine?
References in many bibliographies are sometimes referred to as "Surname, I", so the citations of academics whose Surname and initials are the same may occasionally interfere. This problem is often the case with citation indexes all over the world.
How can I see only citations to my article?
After searching the name of your article, you can see the references to the article you selected as soon as you click on the details section.
 Views 28
 Downloands 3
Моделювання і оцінка ризику відмови системи електропостачання власних потреб атомної електростанції від зовнішніх незалежних джерел живлення
2015
Journal:  
Naukovi Visti NTUU KPI
Author:  
Abstract:

tics. In the conditions of objectively existing aging of electric equipment, climatic conditions deterioration, hard work schedule of operation personnel at modern EES of NPS, there grows the problem of ensuring reliability and safety of functioning of the NPS in the emergencies in a power supply system. That requires carrying out the complex risk analysis of EES subsystems and NPS operation in the case of refusal of electrical equipment. Research objective. Development of mathematical support and software for assessment of circuits reliability and refusal risk of NPS MV external power supply system under conditions of internal MV power supply loss for providing the mode of shut-down cooling and cold start of the block. Implementing procedure. In the condition of essential incompleteness and uncertainty of statistical information on  refusals of external network electric equipment, the hybrid fuzzy-stochastic models of certain electrical equipment failure for an assessment of refusal risk of NPP MV external power source method of electrical equipment failure function of distribution is attached. It is based on use of statistical data on refusals of main population of certain type and voltage class electric equipment as well as the expert estimates of refusal intensity of certain units of equipment. Results of research. The hybrid fuzzy-stochastic models of refusals of the main power and switching equipment of power supply systems and own needs of the NPS and fuzzy-stochastic models of refusal risk assessment of MV external power supply system are developed. The probability assessment of no-failure operation and fuzzy ranging on reliability is carried out for four versions of power supply circuits of the NPS HV distributing device; the refusal risk assessment of the external power supply system from remote power plants and substations is executed. Conclusions. In order to estimate schemes reliability and risk failure of electrical equipment and system of power supply MV from external supplies, fuzzy mathematical models were developed and failure risk estimation of four power supplies schemes for high-voltage NPS highways.

Keywords:

Citation Owners
Information: There is no ciation to this publication.
Similar Articles










Naukovi Visti NTUU KPI

Field :   Fen Bilimleri ve Matematik; Mühendislik

Journal Type :   Uluslararası

Metrics
Article : 342
Cite : 10
Naukovi Visti NTUU KPI