User Guide
Why can I only view 3 results?
You can also view all results when you are connected from the network of member institutions only. For non-member institutions, we are opening a 1-month free trial version if institution officials apply.
So many results that aren't mine?
References in many bibliographies are sometimes referred to as "Surname, I", so the citations of academics whose Surname and initials are the same may occasionally interfere. This problem is often the case with citation indexes all over the world.
How can I see only citations to my article?
After searching the name of your article, you can see the references to the article you selected as soon as you click on the details section.
  Citation Number 8
 Views 79
 Downloands 26
YAPIM İŞİ KAMU ALIMLARINDA YAKLAŞIK MALİYET BELİRLEME USULÜNÜN SÖZLEŞME BEDELİ VE ETKİN KAYNAK KULLANIMINA ETKİSİ
2015
Journal:  
Kırıkkale University Journal of Social Sciences
Author:  
Abstract:

Abstract enThe share of public procurement which is rising in accordance with the development of public services has been increasing in the Gross Domestic Product (GDP). This importance of the public procurement which has a feature of being used as a social policy means in the economy, also arises the need to use the needed public sources more efficiently and productively. In this context, works contracts increase year by year. The estimate cost, the main variant in the determination of public source needs in works contracts is determined and reserved before the contract by contracting authorities is generally fixed based on public unit prices and shows the upper limit of the source which will be saved from the contracting authority’s budget. The determination method of the estimate cost and whether the public sources which are required by the estimate cost are used efficiently and productively are studied in this paper. Furthermore, the burden of these contracts on the public budget is demonstrated by emphasizing the difference between the contract price and the estimate cost occurred at the end of the contract procedure. The effect of the estimate cost determination method on the contract price, efficient sourcing and on the budget burden is studied in this paper via reviewing and analysing the relationship among the variants which take part in the data sets formed from the appeal applications made between 2009 and 2013 towards works contracts and it is understood that the estimate value is determined via public unit prices in works contracts, that resources reserved to the contracts are not used efficiently and that the budget burden is surplus

Keywords:

Citation Owners
Attention!
To view citations of publications, you must access Sobiad from a Member University Network. You can contact the Library and Documentation Department for our institution to become a member of Sobiad.
Off-Campus Access
If you are affiliated with a Sobiad Subscriber organization, you can use Login Panel for external access. You can easily sign up and log in with your corporate e-mail address.
Similar Articles








Kırıkkale University Journal of Social Sciences

Field :   Sosyal, Beşeri ve İdari Bilimler

Journal Type :   Ulusal

Metrics
Article : 77
Cite : 24
Kırıkkale University Journal of Social Sciences