User Guide
Why can I only view 3 results?
You can also view all results when you are connected from the network of member institutions only. For non-member institutions, we are opening a 1-month free trial version if institution officials apply.
So many results that aren't mine?
References in many bibliographies are sometimes referred to as "Surname, I", so the citations of academics whose Surname and initials are the same may occasionally interfere. This problem is often the case with citation indexes all over the world.
How can I see only citations to my article?
After searching the name of your article, you can see the references to the article you selected as soon as you click on the details section.
 Views 55
 Downloands 22
Welfare Effects of Electricity Transit
2010
Journal:  
Sosyoekonomi
Author:  
Abstract:

The liberalization of the European electricity market facilitating the cross-border exchanges of electricity requires the establishment of a system for accessing the European grid. The starting point for the discussion of pricing the access to interconnected networks in this paper is the fact that electricity transit creates external effects to the involved countries which have to be internalized. Using a three countries model we analyze the welfare effects of different compensation scenarios for the electricity transfer between countries under individual and joint welfare maximization. The three countries have different roles: country 1 is an electricity exporting country, country 2 is importing electricity from country 1 and country 3 is the transit country. Individual and joint maximization deliver identical results if and only if export prices and transit charges are equal to marginal production and marginal transit costs. The joint optimum implies that the demand for imported electricity is determined by the sum of all relevant marginal costs: marginal production cost and marginal electricity loss in the export country, marginal transit costs and marginal electricity loss in the import country. The transit country has to be compensated for its electricity loss costs on the basis of marginal costs. Capital costs of transit capacity should only be compensated in the case of capacity shortage in the transit country.

Keywords:

Citation Owners
Information: There is no ciation to this publication.
Similar Articles










Sosyoekonomi
Sosyoekonomi