User Guide
Why can I only view 3 results?
You can also view all results when you are connected from the network of member institutions only. For non-member institutions, we are opening a 1-month free trial version if institution officials apply.
So many results that aren't mine?
References in many bibliographies are sometimes referred to as "Surname, I", so the citations of academics whose Surname and initials are the same may occasionally interfere. This problem is often the case with citation indexes all over the world.
How can I see only citations to my article?
After searching the name of your article, you can see the references to the article you selected as soon as you click on the details section.
  Citation Number 10
 Views 17
Kamu İhale Kanunu’na Göre Yapım İşleri İçin Yüklenici Seçimi, Karşılaşılan Zorluklar ve İhale Yönetimi
2020
Journal:  
Teknik Bilimler Dergisi
Author:  
Abstract:

Birçok ekibin ve organizasyonun bir araya gelmesiyle yürütülen inşaat projelerindeki temel amaç en uygun maliyetle, belirlenen sürede kaliteli bir eser ortaya çıkarabilmektir. Bu amacın gerçekleştirilebilmesi için, öncelikle projenin ihtiyaçlarının ne olduğu ve nasıl karşılanacağı açık bir şekilde ortaya konmalı, buna bağlı olarak projenin parçalarını oluşturan tarafların kapasiteleri iyi tespit edilmeli ve uygun bir sözleşme zemininde bir araya gelmesi sağlanmalıdır. Türkiye’de özellikle son yıllardaki projelerde bu zeminin oluşturulamadığı ve yüklenicilerin ve taşeronların yeterliğinin tespit edilemediği görülmüş, buna bağlı olarak Avrupa Birliği çalışmalarının da etkisiyle, 4734 sayılı Kamu İhale Kanunu gibi düzenlemeler yapılmıştır. Bu çalışma kapsamında Türkiye’deki inşaat projelerinde katılımcıların özelliklerine göre farklılaşan proje teslim türlerine, ihalelere, yüklenici seçim aşamaları ile kıstaslarına ve bu süreçte karşılaşılan zorluklara değinilecek, bu bağlamda ihale yönetimi kavramı genel hatlarıyla ele alınacaktır.

Keywords:

According to the Public Auction Act, Choosing the Supplier for Manufacturing Works, Meeting Challenges and Auction Management
2020
Author:  
Abstract:

The main objective in the construction projects carried out with the reunion of many teams and organizations is to be able to reveal a quality work at the most affordable cost, at the time specified. To this objective, it must first be clearly stated what the needs of the project are and how it is to be met, accordingly the capacities of the parties that make up the part of the project should be well identified and ensuring that they meet on a suitable contractual basis. In Turkey, in recent years, this ground has not been created and the sufficiency of contractors and suppliers has not been identified, according to which, with the impact of the work of the European Union, regulations such as Public Procurement Act No. 4734 have been made. In the framework of this work, the construction projects in Turkey will be addressed to the types of project delivery, tender, contractor selection stages and shortcomings and the challenges encountered in this process, in this context the concept of tender management will be addressed with the general lines.

Keywords:

Citation Owners
Attention!
To view citations of publications, you must access Sobiad from a Member University Network. You can contact the Library and Documentation Department for our institution to become a member of Sobiad.
Off-Campus Access
If you are affiliated with a Sobiad Subscriber organization, you can use Login Panel for external access. You can easily sign up and log in with your corporate e-mail address.
Similar Articles












Teknik Bilimler Dergisi

Journal Type :   Ulusal

Metrics
Article : 254
Cite : 876
2023 Impact : 0.2
Teknik Bilimler Dergisi