User Guide
Why can I only view 3 results?
You can also view all results when you are connected from the network of member institutions only. For non-member institutions, we are opening a 1-month free trial version if institution officials apply.
So many results that aren't mine?
References in many bibliographies are sometimes referred to as "Surname, I", so the citations of academics whose Surname and initials are the same may occasionally interfere. This problem is often the case with citation indexes all over the world.
How can I see only citations to my article?
After searching the name of your article, you can see the references to the article you selected as soon as you click on the details section.
 ASOS INDEKS
  Citation Number 1
 Views 7
 Downloands 1
Yalın Üretimde 6S Uygulamaları için bir Performans Denetim Yöntemi Önerisi
2020
Journal:  
Uluslararası Mühendislik Araştırma ve Geliştirme Dergisi
Author:  
Abstract:

6S is a lean manufacturing technique based on continuous improvement philosophy, which is comprised of six steps: sort, set in order, shine, standardize, sustain and occupational safety. Different audit methods have been proposed in the literature for auditing 6S application performance; however, there is no study showing the validity of checklists and scoring systems of these audit methods. In addition, checklist items related to occupational safety are considered to be superficial. On the other hand, it is a well-known fact that improvements in the occupational safety have productivity-enhancing effects, and similarly, productivity-enhancing activities lead to improvements in occupational health and safety (OHS) issues. The Elmeri method is a OHS method based on checklists, whose performance has been scientifically validated for OHS supervision. In this study, a simple and fast performance audit method based on the Elmeri method has been proposed, which can be used in the manufacturing industry. The proposed method is called 6S-Integrated Performance Audit Method (6SE). The 6SE method presents a new checklist with a total of 40 items of observation rules, 18 of which are from the Elmeri method, 22 of which are derived fom the 6S literature. The application of the 6SE method was carried out in 5 workshops in a large-scale furniture company in Kırıkkkale. The 6SE and Elmeri indices of the factory were calculated on the basis of the collected observation data both on a general basis and on a workshop basis; performances were evaluated according to these index values. Also, the effect of the 6S improvement studies on the aforementioned indices has been analyzed and interpreted. The results showed that the proposed 6SE method is capable of determining the level of continuous improvement in the workshop.

Keywords:

Citation Owners
Attention!
To view citations of publications, you must access Sobiad from a Member University Network. You can contact the Library and Documentation Department for our institution to become a member of Sobiad.
Off-Campus Access
If you are affiliated with a Sobiad Subscriber organization, you can use Login Panel for external access. You can easily sign up and log in with your corporate e-mail address.
Similar Articles










Uluslararası Mühendislik Araştırma ve Geliştirme Dergisi

Field :   Mühendislik

Journal Type :   Uluslararası

Metrics
Article : 351
Cite : 244
2023 Impact : 0.211
Uluslararası Mühendislik Araştırma ve Geliştirme Dergisi