User Guide
Why can I only view 3 results?
You can also view all results when you are connected from the network of member institutions only. For non-member institutions, we are opening a 1-month free trial version if institution officials apply.
So many results that aren't mine?
References in many bibliographies are sometimes referred to as "Surname, I", so the citations of academics whose Surname and initials are the same may occasionally interfere. This problem is often the case with citation indexes all over the world.
How can I see only citations to my article?
After searching the name of your article, you can see the references to the article you selected as soon as you click on the details section.
  Citation Number 2
 Views 13
Multi Agent System Based Risk Allocation Model for Public-Private-Partnership Type Projects (RAMP3)
2022
Journal:  
Turkish Journal of Civil Engineering
Author:  
Abstract:

The performance of the Public Private Partnership (PPP) projects depends on the efficiency of the risk allocation strategies between the public and private parties. Therefore, a multi agent system-based Risk Allocation Model for PPP projects (RAMP3) was developed to determine the proper risk allocation decisions between the public and private parties within the study. The methodology of RAMP3 involves i) identification of risks by agents, ii) assessment of each risk’s importance and impact, iii) communication of agents to negotiate on risk allocation decision and iv) determination of strategies and utility functions to be used in negotiation process. Focus of the study is presenting the steps of negotiation process of agents using economic theory and Zeuthen bargaining strategy. RAMP3 was validated on two real PPP projects and results show that the higher risk value of an agent gets, agent’s utility due to counter agent in that concession round lowers. Preliminary findings also show that risk is allocated to the party that has a higher risk acceptability in negotiation process. The RAMP3 will enable project parties to determine the appropriate risk allocation strategies by considering the effects of emerging risks in terms of time delay, cost overrun and conflict and provide contract success. The model can also be used as a decision support system by public partner for performing an efficient and accurate risk allocation.

Keywords:

0
2022
Author:  
Citation Owners
Attention!
To view citations of publications, you must access Sobiad from a Member University Network. You can contact the Library and Documentation Department for our institution to become a member of Sobiad.
Off-Campus Access
If you are affiliated with a Sobiad Subscriber organization, you can use Login Panel for external access. You can easily sign up and log in with your corporate e-mail address.
Similar Articles










Turkish Journal of Civil Engineering

Journal Type :   Uluslararası

Metrics
Article : 608
Cite : 2.092
2023 Impact : 0.103
Turkish Journal of Civil Engineering