User Guide
Why can I only view 3 results?
You can also view all results when you are connected from the network of member institutions only. For non-member institutions, we are opening a 1-month free trial version if institution officials apply.
So many results that aren't mine?
References in many bibliographies are sometimes referred to as "Surname, I", so the citations of academics whose Surname and initials are the same may occasionally interfere. This problem is often the case with citation indexes all over the world.
How can I see only citations to my article?
After searching the name of your article, you can see the references to the article you selected as soon as you click on the details section.
 Views 18
Techno-economic feasibility analysis of a large-scale parabolic trough thermal power plant in Effurun-Warri, Nigeria
2023
Journal:  
International Journal of Energy and Smart Grid
Author:  
Abstract:

Abstract In the modern world, solar energy is one of the most mature renewable energy resources for electricity generation. Because of the growing interest in green energy and CO2 reduction, concentrated power technologies have gained prominence all over the world. Several parabolic trough power plants are currently operational in various parts of the world. However, despite the region's favorable weather conditions, Nigeria and Sub-Saharan Africa have yet to adopt this technology. To galvanize the integration of solar energy into the energy infrastructure in Nigeria, technical and economic feasibility studies are required. This paper presents a techno-economic viability assessment of a 25 MW Parabolic Trough solar thermal power plant for electricity generation in Effurun-Warri, Nigeria. The System Advisor Model (SAM) software was used for the analysis, based on the validated technical and financial models inbuilt into the software. Results showed that the plant is technically feasible in Effurun-Warri with a capacity factor of over 35%, which compares favourably with other similar plants across the globe. However, the levelized cost of electricity (LCOE) of 11.87 cents/kWh obtained is significantly higher than the subsidized cost of electricity in the country, by about 99%, leading to a negative net present value of the project. To improve cost, optimized design parameters of the plant should be adopted for performance simulation in the SAM software.

Keywords:

0
2023
Author:  
Citation Owners
Information: There is no ciation to this publication.
Similar Articles












International Journal of Energy and Smart Grid

Field :   Fen Bilimleri ve Matematik

Journal Type :   Uluslararası

Metrics
Article : 36
Cite : 17
International Journal of Energy and Smart Grid